Policy Circular No. 25 /2009-2014 Dated the 22nd February, 2010
To
All Regional authorities
Subject: Amendment in Policy Circular No. 94 dated 16.6.2009 – Verification of new IEC.
It has been decided to amend para 2 of the above Policy Circular:
2. The physical verification shall be carried out by a team of two officials which shall be led by an officer not below the rank of FTDO. However in exceptional circumstances, and with specific orders of the HOO in RA’s a two member team comprising of one FTDO/ Section Head/ LA and one UDC/ Senior LDC may carry out inspection of new IEC numbers, as required in the para (1) of the Policy Circular No. 94 dated 16.6.2009.